River training works,can be classified as

(1) Embankments,

(2) Guide Banks or Bell Bunds,

(3) Spurs or Groynes,

(4) Impermeable Groynes,

(5) Permeable Groynes,

(6) Bed Pitching and Bank Revetment, and

(7) Dredging of River.

1. Embankments:

The floods may be prevented from submerging the terrain by constructing earth embankments. They are generally constructed up to a height of 12 m. They are designed and constructed in the same way as an earth dam. The embankments are generally constructed parallel to the river channel.